Top View - 50A1; Choosing And Preparing Site - CYBEX SPARC Owner's Manual

Table of Contents

Advertisement

Top View - 50A1

Dimensions
1
2

Choosing and Preparing Site

Before assembling the unit, verify the chosen site meets the following criteria:
Area is well lit and well ventilated.
Surface is structurally sound and properly leveled.
Free area for access to unit and emergency dismount. Minimum clearance is 23.6 inches (0.6 meters).
Adjacent units may share the free area.
Free Area
1
It is the responsibility of the facility owner/owner of the equipment to ensure that there is appropriate clearance around each machine
to allow for safe use and passage.
In compliance with the ADA (American Disabilities Act) there must be clear floor space of at least 30 by 48 inches and be served by an
accessible route for at least one of each type of exercise equipment. If the clear space is enclosed on three sides (e.g., by walls or the
equipment itself), the clear space must be 36 by 48 inches.
All other machines must have a clear floor space of 23" for all access point on the machine.
The dimensions stated in the assembly instructions of this manual include the maximum foot print (in use) dimensions.
Minimum clearance of 12" (30 cm) between units for proper wireless heart rate signal operation.
34.7" (88 cm)
71" (180 cm)
23.6", 0.6m
Page 10 of 36

Hide quick links:

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the SPARC and is the answer not in the manual?

Questions and answers

This manual is also suitable for:

50a1

Table of Contents