RE 30139-B/12.14 | VT-HNC100...X
the communication between PC and VT-HNC, the initializing of the control, the
archiving of data in the control and the acquisition of data from the control.
Creating a new project using the installed HNC software.
f
After having completed project planning and programming, the VT-
f
HNC100...3X must be initialized with this project. Then, the VT-HNC100...3X
is ready for operation.
8
Operation
During normal operation, the user does not need to intervene.
In case of mains failure during operation, the VT-HNC100...3X can be switched
on again without any further measures and is ready for operation.
8.1
Software description
The WIN-PED® software is described in the previous chapter 7 "Commissioning".
Bosch Rexroth AG
41/48
Operation