Chapter 10: Shut Off Circuit Breaker - Nabco GT1175 Wiring And Programming Manual

Slide door opus control
Hide thumbs Also See for GT1175:
Table of Contents

Advertisement

GT1175 Slide Door Opus Control Wiring and Programming Manual
P/N C-00391
CHAPTER 10: SHUT OFF CIRCUIT BREAKER
Shut the installation site branch Circuit Breaker OFF. Failure to do so may result in serious
WARNING
personal or fatal injury. When uncertain whether power supply is disconnected, always verify
using a voltmeter.
All high voltage electrical connections must be made by licensed electricians according to
WARNING
National and Local electrical codes/regulations.
Permanent wiring shall be employed as required by local codes.
CAUTION
Electrical circuit to Nabco operator must not be not shared with other equipment such as
CAUTION
lighting, cash registers, or any device that might cause electrical interference on the circuit.
Keep sufficient spacing between high-voltage and low-voltage wiring. 120 VAC Power wires
CAUTION
must be routed (separate from other wiring) located near the top of inside Header.
Ensure that incomming electrical ground is properly secured to the grounding screw or
CAUTION
grounding wire, whichever is provided.
Attention:  Insert all Incoming 120 VAC Power wires into the pre drilled Electric Service Access Hole located at the
left or right side of Header End Cap.
Attention:  Electrical circuit to Nabco operator must not be not shared with other equipment such as lighting,
cash registers, or any device that might cause electrical interference on the circuit.
Attention:  Any non-factory low voltage wiring added inside the Header must be Type CL2 wire or the equivalent
in accordance with Article 725 of the NEC.
Note: It is recommended for the Installer to house all Incoming 120 VAC wires within an Electrical Conduit.
18 of 31
www.NabcoEntrances.com
Rev 8-11-21

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents