Figure 10-18 40 A - 140 A - Proper Alignment Of Power Cell Mounting With Receiving Holes; Figure 10-19 200 A - 260 A, 4Q 120 A-160 A - Proper Alignment Of Power Cell Mounting With Receiving - Siemens SINAMICS PERFECT HARMONY GH180 Operating Instructions Manual

Medium-voltage drive for type 6sr5
Hide thumbs Also See for SINAMICS PERFECT HARMONY GH180:
Table of Contents

Advertisement

4. Ensure that the cell chassis mounting edges are sitting inside the edge of the groove rails, and
align the cell mounting holes (one on each side), with the corresponding rail receiver holes,
as shown in the figures labeled "...proper alignment of power cell mounting with receiving
holes".
Figure 10-18
Figure 10-19
Type 6SR5 Air-Cooled
Operating Instructions, AK, A5E39390112
40 A - 140 A - proper alignment of power cell mounting with receiving holes
200 A - 260 A, 4Q 120 A-160 A - proper alignment of power cell mounting with
receiving holes
Maintenance
10.7 Remove and Replace
87

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents