1.- VERIFICATION UPON RECEPTION
1�1�- RECEPTION PROTOCOL
Upon reception of the device, verify the following points:
a) The device meets the specifications described in its order.
b) The device has not suffered any damage during transport.
c) Perform an external visual inspection of the device before connecting.
d) Check that it has been delivered with the following:
1�2�- TRANSPORTATION AND HANDLING
For transporting the device over short distances, the support profiles of the device to the ground facil-
itate handling through the use of pallet trucks or forklifts (
6
- 3 rolls of cable (2 red, 1 yellow-green)
- 1 power supply cable
- Measuring electrodes, GETEST Probe
- 1 backpack, with:
- 1 smartphone
- Calibration Certificate
- Aalligator clips
- Cable for connecting the measuring electrodes
- Measurement spikes
- 2 keys
- Instruction manual
If you notice any reception issue, immediately contact the carrier and/or CIRCUTOR
after-sales service.
Transportation, loading and unloading and handling of the device must be carried
out with the appropriate precautions and manual or mechanical tools to avoid de-
terioration.
If the device must not be installed immediately, it must be stored in a location with
firm and level ground and the storage conditions indicated in the technical charac-
teristics section must be respected. In this case it is advisable to store the device
with its original protective packaging.
Figure 1: Transport with pallet truck�
).
Figure 1
GETEST
Instructions Manual

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the GETEST MPC-5 and is the answer not in the manual?

Questions and answers

This manual is also suitable for:

Getest mpc-20Getest mpc-50Getest mpc-5/50

Table of Contents