AREA
TURNTABLE
1.
Engine Oil (see mfg. manual)
2.
Battery
3.
Radiator
4.
Air Cleaner
5.
Exhaust System
6.
Spark Arrester
7.
Engine Mount
8.
Ground Controls
9.
Main Hydraulic Pump
10.
Auxiliary Power Pump
11.
Valves
12.
Hydraulic Filters
13.
Hydraulic Hoses
14.
Hydraulic Oil Tank**
15.
Breather Hydraulic Tank
16.
Fuel Tank
17.
Cylinders
18.
Hood Doors
19.
Turntable Locking Pin
20.
Horizontal Limit Switch
21.
Oil Coupling
22.
Placards and Decals
23.
Swing Bearing
24.
Swing Brake
25.
Swing Hub
3120869
Table 2-6.Preventive Maintenance and Inspection Schedule
DAILY
WEEKLY
3
5
3
5
3
5
1
14
1
1
1,2,11
1
5
1
5
1,11
5
14
5
1
5
3
5
6,14
3,5
1,5,6,13
1
1,7
1,7
5
1,2
1
1,5,6
– JLG Lift –
SECTION 2 - PROCEDURES
INTERVAL
MONTHLY
3 MONTH
1,5
1,5
17
1
4
4
4
9, 12
8
3,9
6 MONTH
YEARLY
2-65