JLG 450A Service And Maintenance Manual page 61

Table of Contents

Advertisement

SECTION 2 - PROCEDURES
12. With "X" marked side facing up, place the ring gear
(4) around cluster gears (3F).
NOTE: This will hold the punch marks in position while
installing the carrier into the hub.
13. Place the carrier sub assembly (3) and ring gear (4)
together into mesh with internal gear (2), aligning
the "X" marked shoulder bolt hole in the ring gear (4)
over one of the shoulder bolt holes in the hub. Mark
the location of shoulder bolt holes on the outside of
ring gear and hub.
NOTE: You may lift the ring gear off the hub to align the
shoulder bolt holes. The ring gear and carrier are
installed together only to keep the punch marks on
the carrier in place.
2-44
14. With the internal splines facing up (counterbore end
facing down), place input gear (8) into mesh with
carrier sub-assembly (3).
15. Oil all exposed surfaces inside the hub (1G). Place
thrust washer (11) into the counterbore in top of the
carrier.
BEWARE OF SHARP EDGES IN THE COUNTERBORE WHEN YOU
INSTALL THE O-RING.
16. Set the cover (6A) on table, interior side up. Grease
o-ring (5) and place it into the counterbore around
the edge of cover (6A).
NOTE: The o-ring may be stretched or pinched together to
make it fit the counterbore exactly.
– JLG Lift –
3120869

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

450aj

Table of Contents