8. Using retaining ring pliers, insert retaining ring (7B)
into the groove on input shaft (7A) by compressing
the spring and spacers together.
9. With large splined end down, place input shaft sub-
assembly (7) into spindle (1A).
3120869
Figure 2-30. Cluster Gear Punch Marks
– JLG Lift –
SECTION 2 - PROCEDURES
10. Place thrust spacer (9) onto input shaft (7).
11. Set carrier sub-assembly (3) on a flat work surface
so the large ends of cluster gears (3F) face up.
Locate the punch marks on the face of each cluster
gear (3F) and position them at 12 o'clock.
2-43