Nortel CallPilot Installation And Configuration Manual page 78

Hide thumbs Also See for CallPilot:
Table of Contents

Advertisement

Installing the server and connecting the peripherals
9
Do the following:
IF the Fiber Routing Guide THEN
is required
not required
78
do the following:
a Position the ferrites so that the SCSI cable
and ferrites can be pushed as far up and
back as possible inside the Option 11C Mini
cabinet.
There is very little space to work with. Work
with the cable and ferrites (including the
ferrite that was already installed on the SCSI
cable) until you can correctly and securely
install the fiber optic spool.
b Route the SCSI cable out through the top
cable trough on the Option 11C Mini
cabinet.
See "SCSI cable installation to accommodate
the Fiber Routing Guide" on page 79.
do the following:
a Position the ferrites as close to the SCSI
connector as possible.
b Secure the ferrites with a tie wrap.
c Route the SCSI cable across the inside of
the Option 11C Mini cabinet and out through
the bottom cable trough.
See "SCSI cable installation when the Fiber
Routing Guide is not required" on page 80.
Standard 1.0
CallPilot

Advertisement

Table of Contents
loading

This manual is also suitable for:

201i

Table of Contents