IKA C 200 Operating Instructions Manual

IKA C 200 Operating Instructions Manual

Calorimeter system

Advertisement

Quick Links

Calorimeter System C 200
Operating instructions
EN

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the C 200 and is the answer not in the manual?

Questions and answers

Summary of Contents for IKA C 200

  • Page 1 Calorimeter System C 200 Operating instructions...
  • Page 2: Table Of Contents

    Transport, storage, place of installation Conditions of transport and storage Place of installation Unpacking Delivery scope Installations and starting up Calorimeter C 200 Installation Switchin on the system Display and operating elements Configuring the system System settings Filling the calorimeter for the first time...
  • Page 3: Declaration Of Conformity

    EN 61010-2 et EN 61326-1. Technical data Une copie de la déclaration de conformité UE complète peut être demandée en adressant un courriel à l’adresse sales@ika.com. DECLARACION DE CONFORMIDAD Declaramos por nuestra responsabilidad propia que este producto corresponde a las directrices 2014/35/UE, 2014/68/UE, 2014/30/UE y 2011/65/UE y que cumple las normas o documentos normativos siguientes: EN 61010-1, EN 61010-2 y EN 61326-1.
  • Page 4: Safety Instructions

    • Anyone operating a pressure vessel must keep it following materials, for example, could pose a • Calorimeter system C 200 may only be used to position vessel. in a proper condition, operate it properly, super-...
  • Page 5: User Information

    You can also return the appliance directly to IKA- WERKE. Please enclose the sales invoice and the reason for the claim and state the name of the contact person at your company.
  • Page 6: Installations And Starting Up

     Connecting the water drain Installation and starting up 4.1 Calorimeter C 200  Measuring cell cover  Tank fillers  Display  Keyboard  Inner vessel emergency drain  Fill level display  Tank drain  Inner vessel drain 4.2 Installation...
  • Page 7: Switchin On The System

    Set date  Delete button: this key is used to delete the  Menu header: 4.3 Switching on the system last character entered. shows the name of the submenu and the cur- Switch the calorimeter on at ON/OFF switch rently selected menu line of the total number of ...
  • Page 8: System Settings

    Time control MENU (F3) MENU (F3) Calorimeter C 200 performs the measurement  UP/DOWN (F2) to "General"  UP/DOWN (F2) to "Unit"  OK (F1)  OK (F1) automatically according to a set period of time and calculates the provisional result. The measu- ...
  • Page 9: Coding Decomposition Vessel

    4.10 Oxygen station C 248 4.8 Switching off the system Calorimetric measurements Standby mode The C 200 does not have an integrated oxygen filling point for the decomposition vessel. You In many cases, however, not just the combus- 5.1 Determining the calorific value In order to switch off the calorimeter system, the can use oxygen station C 248 for filling.
  • Page 10: Information About The Sample

    When using a IKA pelleting press C 21 and IKA analytical mill A The heat capacity is determined by the measu- combustible crucible you do not need an extra 11 basic (see Accessories) are available for sample ring cell and the decomposition vessel.
  • Page 11: Preparing The Decomposition Vessel

    Handle  Selecting MEASUREMENT (F2) will take you to the "Prepare measurement" menu.  Place the decomposition vessel into the inner vessel of calorimeter C 200. The decomposition vessel must be placed between the three locating bolts.  Cotton thread ...
  • Page 12: Performing The Measurement

    QEXTERNAL2  a) The measurement process is fully automatic for automatic measuring procedures (isoperibol, Correction value for the heat energy from other burning aids e. g. combustible crucible). The de- dynamic and time-controlled, see section 4.6). fault value is 0. The result will appear once the measuring pro- cess is complete.
  • Page 13: Errors In The Measuring Procedure

    IKA-Service. nition (0.05 K). If this does not work either, please contact IKA- Service.
  • Page 14 Meldung: Pump Reset Service menu Füllzeit überschritten Switch the pump on with this menu item. The This menu item allows you to restore the default outer vessel will be filled and rinsed (see also sec- settings. 7.1 Operation tion 4.7). Reinit This menu allows you to directly control and test Please note that you must stop every started ac-...
  • Page 15 (Decontamination Certificate)” from IKA maintained at a constant temperature in the last manufacturer, check with the manufacturer that or use the download printout of it from IKA web- measurement (before long gaps in measuring). the intended method will not destroy the appli- site at www.ika.com.
  • Page 16 Technical data Table power supply (external): Rated voltage 100 - 240 V AC Frequency 50 / 60 Input power max. Calorimeter: Rated voltage 24 V DC 5A Input power max. Fuses (internal) 1x 2,5 AT Perm. on-time Continuous operation Protection class as per DIN EN 60 529 IP 20 Protection class Overvoltage category...
  • Page 17 VIETNAM IKA Vietnam Company Limited Phone: +84 28 38202142 eMail: sales.lab-vietnam@ika.com Discover and order the fascinating products of IKA online: www.ika.com IKAworldwide IKAworldwide /// #lookattheblue @IKAworldwide Technical specifications may be changed without prior notice.

Table of Contents