Installation; Grounding (Atex Systems Only); Lifting The System - Graco EcoQuip 2 EQm Instruction Manual

Hide thumbs Also See for EcoQuip 2 EQm:
Table of Contents

Advertisement

Installation

Installation

Grounding (ATEX systems only)

The equipment must be grounded to reduce the risk
of static sparking. Static sparking can cause fumes to
ignite or explode. Grounding provides an escape wire
for the electric current.
Systems: Use supplied ground wire and clamp
(237686).
Air and fluid hoses: Use only genuine Graco
conductive blast hoses with a maximum of 150 ft (45 m)
combined blast hose length to ensure grounding
continuity. Check the electrical resistance of the blast
hoses. If the total resistance to ground exceeds 29
megaohms, replace the blast hose immediately.
Air compressor: Follow manufacturer's
recommendations.
10

Lifting the System

Before lifting the system, drain the water tank and
pot of media and water.
Lift the system with a lift apparatus rated
appropriately for the weight of the system. See ,
page 50.
Do not lift the system by the handle on the EQm pot.
Lift the system using the lift eyes shown on the
following illustration.
3A3489T

Advertisement

Table of Contents
loading

Table of Contents