SECTION 25 (Continued)
®
EVT PRO 2.0
PRV DATA ENTRY
Adding a new PRV to the database: (Refer to figure 25.3)
Main Menu → Edit Database → Safety Valves
Select the applicable Client;
Select the applicable Plant;
Activate the Add Valve [F1] action button;
Enter all required/applicable PRV data;
Activate the Save action button to store the data.
Modifying Existing Valve Details and/or Test Parameters: (Refer to figure 25.3)
Main Menu → Edit Database → Safety Valves
Select the applicable Client;
Select the applicable Plant;
Highlight the applicable PRV and activate the Modify [F3] action button;
Enter/revise all applicable information;
Activate the Save action button.
Figure 25.3 Adding / Modifying a Valve in the Database
®
Operations and Technical Manual (Rev 1.0 – 2016)
EVT PRO 2.0
NOT FOR COPY OR DISTRIBUTION
Page 29