Commissioning; Function Check; Switching On The Measuring Device - Endress+Hauser Profi Bus Levelflex M FMP40 Operating Instructions Manual

Guided level-radar
Table of Contents

Advertisement

Commissioning

ENDRESS + HAUSER
+
E
62
6
Commissioning
6.1

Function check

Make sure that all final checks have been completed before you start up your measuring point:
• Checklist "Post-installation check", → ä 33.
• Checklist "Post-connection check", → ä 38.
6.2

Switching on the measuring device

When the device is switched on for the first time, the following messages appear in a sequence of 5
s on the display: software version, communication protocoll and language selection
Levelflex M FMP40 PROFIBUS PA
Select the language (this message appears the first time
the device is switched on)
Select the basic unit (this message appears the first time
the device is switched on)
The current measured value is displayed
F
After
is pressed, you reach the group selection
This selection enables you to perform the basic setup
Endress+Hauser

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the Profi Bus Levelflex M FMP40 and is the answer not in the manual?

Questions and answers

This manual is also suitable for:

Levelflex m fmp40

Table of Contents