PUZ-ZM
P SERIES - OUTDOOR UNIT - Power Inverter
230V
Three-phase connection
DIAMETER
SIZE
MODEL
Liquid mm
(inches)
35
6,35 (1/4")
50
6,35 (1/4")
60
9,52 (3/8")
71
PUZ-ZM
9,52 (3/8")
100
9,52 (3/8")
125
9,52 (3/8")
140
9,52 (3/8")
Exemple of total additional charge calculation
Formula
Precharge lenght (m)] x additional charge (g/m)
Example
Outdoor unit = PUZ-ZM100YKA
Total pipes lenght (inlet piping only) = 90 m
Lenght with additional charge (as tab) = 30 m
Additional charge = 40 g/m
Calculation: ∆W(g) = [90 - 30] x 40 = 2400 g
38
L
N
Breaker
L1
L2
380V
L3
N
Breaker
EXTERNAL PIPING
Gas mm
Max
Max
(inches)
Height
Lenght*
Pipe Bends
12,7 (1/2")
30
50
12,7 (1/2")
30
50
15,88 (5/8")
30
55
15,88 (5/8")
30
55
15,88 (5/8")
30
100
15,88 (5/8")
30
100
15,88 (5/8")
30
100
∆W(g) = [Lenght of pipes (m) -
S1
S2
S3
PUZ-ZM
REFRIGERANT CHARGE
Precharge
Additional
Max
Precharge
lenght
charge
Kg*
mt.
15
2,00
15
2,00
15
2,80
15
2,80
30
15
4,00
15
4,00
15
4,00
MIN AREA according to standard CEI EN 60335-2-40 ED6 R32 - HUMAN COMFORT
UNIT
INDOOR
WALL MOUNTED
CEILING - DUCTED
S1
S2
S3
Operating
tonCO
eq
tonCO
eq
current
2
2
precharge*
max charge*
g/mt
1,35
1,55
15
1,35
1,86
1,89
3,38
1,89
3,38
40
2,70
5,40
2,70
5,40
2,70
5,40
Max charge (kg)
OUTDOOR
35
2,30
50
2,30
60
3,80
71
3,80
100
6,80
125
6,80
140
6,80
35
2,30
50
2,30
60
3,80
71
3,80
100
6,80
125
6,80
140
6,80
ELECTRICAL DATA
Breaker
max
1
16 A
1
16 A
1
25 A
1
25 A
1 / 3
32 A / 16 A
1 / 3
32 A / 16 A
1 / 3
40 A / 16 A
Min Area (m²)
5,00
5,00
13,66
13,66
43,73
43,73
43,73
3,35
3,35
9,14
9,14
29,27
29,27
29,27

Advertisement