Download Print this page

Mitsubishi Electric M Series Installation Manual page 27

Hide thumbs Also See for M Series:

Advertisement

PUMY-P
Y SERIES- DC Inverter/Heat Pump
SIZE
MODEL
Liquid mm
(inches)
112
125
PUMY-P
9,52 (3/8")
140
200
Refrigerant piping diameter in section from
branch box to indoor unit
INDOOR UNIT
MODEL
SERIES
NUMBER
15 to 42
50
M series or
S series
60
71
35,50
P series
60 to 100
PUMY-P 112/125/140
LIQUID PIPES
SECTION
+
6,35 (1/4'')
meters x 19 g/m
PUMY-P 200
LIQUID PIPES
SECTION
+
6,35 (1/4'')
meters x 19 g/m
Branch box connection section*
Connection
Liquid
Unit A
Liquid
Unit B
Liquid
Unit C
Liquid
Unit D
Liquid
Unit E
*Pipes diameter have to coincide with the indoor units pipes diameter..
Any reduction will be made on the Branch Box.
DIAMETER
EXTERNAL PIPING
Gas mm
Max
Max
(inches)
Height
Lenght*
15,88 (5/8")
TAB.
19,05(3/4")
A
B
LIQUID PIPE
GAS PIPE
Ø6.35
Ø9.52
Ø6.35
Ø12.7
Ø6.35
Ø15.88
Ø9.52
Ø15.88
Ø6.35
Ø12.7
Ø9.52
Ø15.88
LIQUID PIPES
INDOOR CONNECTED
SECTION
CONNECTED
+
9,52 (3/8'')
TOTAL POWER
meters x 50 g/m
up to 8 kW
8,1 kW to 16,0 kW
over 16,1 kW
LIQUID PIPES
LIQUID PIPES
SECTION
SECTION
+
9,52 (3/8'')
12,7 (1/2'')
meters x 50 g/m
meters x 92 g/m
PAC-MK53BC
6,35 (1/4")
Gas
9,52 (3/8")
6,35 (1/4")
Gas
9,52 (3/8")
6,35 (1/4")
Gas
9,52 (3/8")
6,35 (1/4")
Gas
9,52 (3/8")
6,35 (1/4")
Gas
12,7 (1/2")
REFRIGERANT CHARGE
Precharge
Max
Precharge
lenght
Pipe Bends
Kg*
mt.
4,80
4,80
0
4,80
7,30
Refrigerant piping diameter in section from
branch box to branch box
LIQUID LINE
9,52 (3/8")
AMOUNT OF REFRIGERANT
TO ADD
1,5 kg
2,5 kg
3,0 kg
INDOOR CONNECTED
CONNECTED
+
TOTAL POWER
up to 16 kW
16,1 kW to 25,0 kW
over 25,1 kW
PAC-MK33BC
6,35 (1/4")
9,52 (3/8")
6,35 (1/4")
9,52 (3/8")
6,35 (1/4")
9,52 (3/8")
-
-
-
-
MITSUBISHI ELECTRIC / Y SERIES
Additional
tonCO
eq
tonCO
charge
2
precharge*
max charge*
g/mt
10,02
47,61
10,02
47,61
TAB.
10,02
47,61
15,24
47,61
GAS LINE
15,88 (5/8")
AMOUNT OF REFRIGERANT
TO ADD
2,5 kg
3,0 kg
3,5 kg
R410A
BREAKER
eq
2
32 A / 16 A
32 A / 16 A
32 A / 16 A
25 A
25

Advertisement

loading