6. Dynamic Power Management for Business
(optional)
If the customer has purchased Dynamic Power Management for Business (DPM for Business) along with the charge
point, install the DPM for Business equipment in the distribution board, following the steps below. If the DPM for
Business equipment is not included in the project plan, proceed to chapter 7. Commissioning.
In chapter 5.3. Preparation, you have laid out an Ethernet cable for this connection.
NOTICE
6.1.

Internal connections

RC1, RC2, RC3
W1, W2, W3
B1, B2, B3
U12, U23, U31
L, N(L)
V1, V2, V3, VN
ETH
PE
6.2.
Technical specifications

6.2.1. EMpro power meter

General
Display
Voltage measurement range
Dimensions (H × W × D)
Power consumption
Mains type
Mains fuse
Operating mode
Compliance
Installation manual – NewMotion Business Pro & Lite 2.1 / 2.2 - 091NMEN13
RC
RC
RC
1
2
3
W
B
W
B
W
B
1
1
2
2
3
3
230,0v
U
12
229,9v
U
23
1
2...6
230,1v
U
31
L
N
V
V
V
V
(L)
1
2
3
N
Current measuring input, Rogowski current sensor
White signal cable of the Rogowski current sensors
Blue signal cable of the Rogowski current sensors and shielding of the signal cable
Voltage measurement from each Rogowski current sensor
Power supply
Voltage measuring input
RJ45 Ethernet connection
Functional ground
LCD display with two-color backlit
100-230V AC or 150-250 V DC
90 x 90 x 71.9 mm
≤4 W
3-phase (3 or 4 conductor) and 1-phase (1 conductor)
≤16 A
Indoor use
CE
1
2
3
4
ETH
EN
33

Advertisement

Table of Contents
loading

This manual is also suitable for:

Business pro 2.1Business lite 2.1Business lite 2.2

Table of Contents