newmotion Business Pro 2.2 Installation Manual page 19

Table of Contents

Advertisement

T20
5 . Remove the rear cable clamp (see fi gure
6 . Place the plastic spacers on the back of the casing (see fi gure
7 . Insert the coloured grommet matching the power cable thickness into the rear input hole (see fi gure
Use a caliper to measure the thickness of the power cable and determine the correct coloured grommet.
NOTICE
8 . Feed the power cable approx. 15 cm through the coloured grommet. Lubricate if necessary (see fi gure
9 . Punch a hole in the grey grommet(s) for the data cable(s) using a screwdriver.
10 . Feed the Ethernet cable for incoming data through the right grommet, as seen from the back. (See fi gure 18 )
For Business Pro charge points: Check the project plan to see if the Business Pro charge point is
NOTICE
connected to the backoffi ce via Ethernet cable or cellular connection. In case of cellular connection, there is no
Ethernet cable for incoming data.
11 . Feed the Ethernet cable for outgoing data through the left grommet, as seen from the back.
For Business Lite charge points: Check the project plan to see if the Business Lite charge point is
NOTICE
connected to a next Business Lite charge point. If this charge point is the last in the confi guration, there is no
Ethernet cable for outgoing data.
Installation manual – NewMotion Business Pro & Lite 2.1 / 2.2 - 091NMEN13
i
).
171
172
).
o
Ø10 - 13 mm
Ø13 - 15.5 mm
Ø15.5 - 18 mm
Ø18 - 21 mm
Ø21 - 22.5 mm
).
173
).
174
19
EN

Advertisement

Table of Contents
loading

This manual is also suitable for:

Business pro 2.1Business lite 2.1Business lite 2.2

Table of Contents