  • Page 1 INSTRUCTION MANUAL – EN Home Basic Edition 7 Home Basic Edition 11...
  • Page 3: Product Description And Intended Use

    Nor any work in rainy conditions or when the humidity is does NewMotion accept any liability for any such loss or above 95%. The safety guidelines are intended to ensure damage arising out of your reliance on any information correct installation and usage.
  • Page 4 2. CHARGE POINT OPERATION This selected charge point is not connected to a back office. No online services or remote support are available for this charge point. In case of an error or issue, on site support is needed from a ZE-Ready certified installer. Your Renault dealer should be able to provide you a list of ZE-Ready certified installers.
  • Page 5: Product Overview

    3. PRODUCT OVERVIEW 3.1 MOUNTING, PACKAGE CONTENTS AND REQUIRED TOOLS Package contents charge point Required tools & additional materials (not provided) Wall mounting - Charge point; - 4x 6.3mm x 70mm self tapping pan - Rubber grommets (various sizes); head screws (DIN 7981C) stainless steel - 2x Plastic spacers;...
  • Page 6: Technical Specifications

    Home Basic Edition 7: single phase 32A* (7,4kW) Home Basic Edition 11: triple phase 16A* (11 kW) Standard configured charge capacity Home Basic Edition 7: 3,7 kW - single phase 16A** Home Basic Edition 11: 11 kW - triple phase 16A** Electric safety category...
  • Page 7 3. PRODUCT OVERVIEW 3.2 TECHNICAL SPECIFICATIONS (CONTINUED) Operating temperature range -30℃ to +50℃ Operating humidity range 5% to 95% Operating air pressure range 860 hPa to 1060 hPa Maximum mounting height socket 1.5 meter above ground Advised mounting height socket 1 meter above ground Mounting position Vertical and upright position only...
  • Page 8: Overview Of Product

    3. PRODUCT OVERVIEW 3.3 OVERVIEW OF PRODUCT LED status indicator Type 2S shutter EV Plug socket & Cover lid Identification label with serial number INSTALLATIEHANDLEIDING – P8 VERSION 0129NM02INT01 INSTRUCTION MANUAL – P8 | P8 06A0RNM20ENG05...
  • Page 9 3. PRODUCT OVERVIEW 3.4.1 OVERVIEW OF CONNECTIONS | 7,4 KW VERSION Phase wire connection Neutral wire connection Earth wire connection Earthing pole connection Power cable Earthing pole Cable clamp INSTALLATIEHANDLEIDING – P9 VERSION 0129NM02INT01 INSTRUCTION MANUAL – P9 | P9 06A0RNM20ENG05...
  • Page 10 3. PRODUCT OVERVIEW 3.4.2 OVERVIEW OF CONNECTIONS | 11 KW VERSION Power cable connections Phase 1 Phase 2 Phase 3 Neutral Earth Tension relief data cable Earthing pole connection Earthing pole Cable clamp Power cable inlet INSTALLATIEHANDLEIDING – P10 VERSION 0129NM02INT01 INSTRUCTION MANUAL –...
  • Page 11 3. PRODUCT OVERVIEW 3.4.3 OVERVIEW INSTALLING ACCESSORIES Rotary switches and dipswitches for maximum current, Load Shedding and cable lock configuration (see chapter 6) 11 kW model RJ12 - P1 port ON/OFF Peak Load Shedding connection module (L2 & L3 from accessories cable) Shunt connection...
  • Page 12: Installation Details

    4. INSTALLATION DETAILS The electrician is responsible for selecting a cable thickness & safety components appropriate for the specific situation and according to regulations; Wiring advice* - Wire for the maximum hardware amperage under continuous load; - Calculate with a COS-Phi of 0.8; - Calculate with a max allowable voltage drop over the cable of 2%;...
  • Page 13: Installation Procedure

    5. INSTALLATION PROCEDURE 5.4A LOAD SHEDDING - CT FOR 7,4 KW Thank you for installing this charge point. Make sure there is enough space to properly do the work. MODEL Ensure to work safely and take the safety of others into The Current Transformer for Load Shedding (included consideration as well, always work according to local in box) must be connected to the phase used by the...
  • Page 14 5. INSTALLATION PROCEDURE has a broken white stripe. This wire is the power adapter Step 3: Connect L1 and Neutral wires of the accessory GND and should therefore be connected to the GND pin cable to the charge point connector indicated with (right) on the module.
  • Page 15 5. INSTALLATION PROCEDURE 5.7 ON/OFF PEAK ACCESSORY On/Off input Connection to the Smart Meter Step 1: Pick the (unsupplied) cable with 5 wires On/Off peak relay designated for accessories; Output to charger Connection of the On/Off peak wiring Step 2: Select the appropriate grommet to suit the cable to the charger thickness and place it in the opening of the cable inlet.
  • Page 16: Local Configuration

    6. LOCAL CONFIGURATION 6.3 LOAD SHEDDING SETTING The Home Basic Edition can be configured locally using the rotary switches and dip switches on the chargepoint. Enable Load Shedding if the CT for 7,4 kW charge point or Load Shedding module for 11 kW charge point Make sure that the charge point is not yet powered on is installed.
  • Page 17 7. USER MANUAL & TROUBLESHOOTER 7.1 REGULAR USE 7.3 TROUBLESHOOTER The first step is to connect your car to the charge point by plugging in the charge cable, the session will start DO YOU SEE A RED LED LIGHT ON YOUR CHARGE automatically.