5. Installation
5.1.
Scope of delivery/Check the contents
5.1.1. Business Pro & Lite 2.1 / 2.2
1
1. Charge point (1×)
2. Coloured grommet 10 - 22.5 mm (6×)
3. Earthing wire (1×)
4. Plastic spacer (2×)
5. M8 × 35 mm Allen bolt (4×)
6. M8 washer - big (4×)
5.1.2. Optional
1. Mounting pole
2. Concrete base
Installation manual – NewMotion Business Pro & Lite 2.1 / 2.2 - 091NMEN13
2
11
10
9
1
q
3
4
9
7. M8 washer - small (5×)
8. M8 × 12 mm PZ3 head bolt (5×)
9. Wall mounting bracket (1×)
For wall mount (use only if applicable)
10. M4 × 12 mm Torx bolt (6×)
11. M4 × 20 mm Torx bolt (1×)
2
5
6
8
7
13
EN