M8 × 35 mm
2 . Place the pole on the concrete base.
3 . Secure the pole to the concrete base using 4 provided M8 × 35 mm Allen bolts and washers (see fi gure 27 ).
4 . Feed the power cable and data cable(s) through the pole (see fi gure 28 ).
Check the project plan to see how many data cables are required for this charge point.
NOTICE
5 . Place the concrete base into the hole (see fi gure 29 ).
Ensure there is at least 5 cm distance between the top of the concrete base and the earth surface.
NOTICE
6 . Fill up the hole with fi ll sand (not provided) (see fi gure 30 ).
Make sure the pole is level using a spirit level.
NOTICE
7 . Pack the sand down around the pole to ensure that the pole remains stable over time.
Use a plate compactor to pack the sand down, especially when there have been civil works.
NOTICE
Installation manual – NewMotion Business Pro & Lite 2.1 / 2.2 - 091NMEN13