5.4.1. Wall mount
1. Secure the wall bracket to a wall at the appropriate height (± 90 cm) (see figure 15).
Make sure the wall is strong enough to withstand the weight of the charge point.
NOTICE
2. Place the casing on the wall mount and mark the locations for the bottom fasteners (see figure 16).
3. Remove the casing from the mount and drill two holes for the bottom fasteners.
Check the fastener package for the correct diameter and depth.
NOTICE
4. Insert two wall plugs into the holes (if applicable).
Installation manual – NewMotion Business Pro & Lite 2.1 / 2.2 - 091NMEN13
±90 cm
y
u
EN
18