Danfoss EC-LTS1200-410 User Manual page 28

Liquid cooled heavy duty inductor unit
Hide thumbs Also See for EC-LTS1200-410:
Table of Contents

Advertisement

User Guide
EC-LTS1200-410
Installation
28 |
©
Danfoss | July 2021
Cable to the gland assembly
4. After the cable gland is in place remove the length A piece of the sheath and cut the braid screen
(cover) from 10 mm (distance C) from the gland bottom as shown in Figure below.
Make sure that the cable gland spring is against the cable sheath (that is protected with
copper tape) before cutting the braid screen.
Cut the braid screen
5. Cut a piece of length D of the inner sheath shown in Figure below. The length D must be equal to the
length of the cable lug body.
BC355449988603en-000201

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents