Danfoss EC-LTS1200-410 User Manual page 27

Liquid cooled heavy duty inductor unit
Hide thumbs Also See for EC-LTS1200-410:
Table of Contents

Advertisement

User Guide
EC-LTS1200-410
Installation
©
Danfoss | July 2021
1. Remove the small hexagonal piece from the BlueGlobe-sealing insert as shown in Figure below.
BlueGlobe-sealing
2. Cut the cable sheath at the distance A from the end of the cable, see Figure below. Pull the cut part of
the sheath partly (length B is from 10 to 15 mm) off the cable as shown in the figure. Distance A depends
of the length of the used cable lug. Measure with the cable lug that is used and cut to suitable length.
Install two layers of copper tape on the cable so that the distance B is covered. Use 3M
Copper Foil Tape 1181 or similar.
Do not remove the cable sheath completely at this point and do not cut the braid screen of
the cable.
Cut length of the cable sheath
3. Insert the cable to the cable gland with slight turning motion. This helps the cable go through the
spring inside the cable gland. Push the cable gland against the sheath of the cable as shown in Figure
below.
BC355449988603en-000201 | 27

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents