Power Up Testing; Self-Test - ADTRAN TDU 120e User Manual

Adtran user manual network device tdu 120e
Table of Contents

Advertisement

Chapter 2. Installation

POWER UP TESTING

Self-Test

When...
Initiating a self-test
The self-test is completed All LEDs go back to their normal state. The terminal
A failure is detected
Type of Test
Board level tests
Unit level tests
2-8
When shipped from the factory, the TDU 120e is set to fac-
tory default conditions. At the first application of power,
the unit automatically executes a memory self-test. A full
self-test can be run from the terminal. A passcode and
unit ID may be set using the U
The terminal displays System Self-test Now
Testing and Memory Test Now Testing. The test
LEDs are illuminated.
momentarily displays System Self-test Tests
passed.
A list of failures is displayed on the terminal.
The full self-test procedure (invoked from the terminal or
T-Watch PRO) consists of the following tests:
The TDU 120e contains an on-board processor which
executes a series of tests checking the circuitry on the
board.
RAM and EPROM tests
Verify on-board circuitry
Front panel LED verification
Board-to-board interface test
A test pattern is sent from the controller through a loopback
on all other boards and checked on the controller. This
verifies the data path, clocks, and control signals for the
entire chassis.
TDU 120e User Manual
menu. See page 6-3.
TILITY
Then...
Explanation
61202156L2-1

Advertisement

Table of Contents
loading

This manual is also suitable for:

1202156l11202155l11202156l21202155l2

Table of Contents