Assembly And Installation - Ecolab DG1-III-DLA-PCB Operating Instructions Manual

Microprocessor-controlled dosing unit
Table of Contents

Advertisement

Available languages

Available languages

Assembly and installation

6
Assembly and installation
Personnel:
Protective equipment:
The DG1-III is prepared for wall mounting with the product storage container placed on
the right-hand side.
If required, the product reservoir can also be placed on the left-hand side of the housing.
This involves moving the suction lance and the outlet for the power cable to the left-hand
side of the housing.
NOTICE!
The following connection and installation instructions constitute the
recommended procedure. However, the ambient conditions determine the
actual assembly and installation methods.
It is important to pay attention to conditions at the site of use.
Wall mounting
A mounting kit DG1-III with dowels and fixing screws as well as a drilling template are
included in the scope of delivery. If necessary, use special dowels and screws to fix the
unit.
1
8
2
10
Fig. 3: Wall assembly of DG1-III
1
Rawl plugs (4 x)
2
Rear panel of the housing
3
Screws (4 x)
4
Rawl plugs (2 x)
5
Screws (2 x)
MAN049250 Rev. 1-01.2021
n
Specialist
n
Service personnel
Protective gloves
n
n
Face protection
n
Safety shoes
3
4
5
6
7
8
9
26
6
Console for product container
7
Cover
8
external type plate
9
Stop screws (3 x)
10 Internal type plate

Advertisement

Table of Contents
loading

Table of Contents