Starting up

Personnel:
Protective equipment:
Commissioning procedure
1.
Open the angle valve.
2.
Check the water connection for leaks.
3.
Connect disinfectant:
Swivel the suction lance forward and insert it into the canister opening.
4.
Ä Chapter 7.2 'Bleeding of product and water pipe' on page 32
5.
Ä Chapter 7.3 'Setting the concentration' on page 33
6.
Ä Chapter 7.4 'Calibration' on page 34
7.
Ä Chapter 7.5 'Checking the Concentration' on page 35
7.1

Hot water operation (optional, only with upstream mixer tap)

If necessary, DG1-III can also be operated with hot water.
A mixer tap must be connected upstream for this purpose.
The max. permissible input temperature must not be exceeded under any circumstances
see also
Ä Chapter 13 'Technical data' on page 60.
In addition, the instructions of the corresponding chemical product, which are described in
the associated safety data sheet, must also be observed.
n
Mechanic
n
Service personnel
n
Specialist
n
Protective gloves
n
Face protection
n
Safety shoes
31
Starting up