Ecolab DG1-III-DLA-PCB Operating Instructions Manual page 101

Microprocessor-controlled dosing unit
Table of Contents

Advertisement

Available languages

Available languages

The power line is retracted into the housing as follows:
1.
Pull the suction lance (pos. 1) out of the housing until the cable gland for the mains
cable is accessible.
2.
To do this, loosen the hose clamp (pos. 2) and unscrew the union nut from the
suction lance.
3.
Detach the cable duct from the fastener and open it.
4.
Retract the power line into the housing.
5.
Close the cable duct and push back into the fastener.
6.
Push the suction lance feedthrough back into its original position.
7.
Tighten the union nut (it must still be possible to turn the suction lance).
8.
Tighten the hose clamp.
9.
Roll up the power cable in the housing and use cable ties to secure it into place.
NOTICE!
Make sure that the power cable does not come into contact with any
sharp parts in the device or with the product.
2
1
29
Assembly and installation
MAN049250 Rev. 1-01.2021