Configuration and Alignment
All configurations are done on the E2E except for the initial configuration to connect the PoP DN to the
E2E. The configuration parameters are:
PoP
l
PoP/DN/CN
l
Nodes deployment
The configuration of cnWave™ nodes is handled automatically by the E2E service. However, the first PoP
node must be configured manually since connectivity to the E2E controller has not yet been established.
After establishing communication with the E2E controller, the nodes report a hash of their local
configuration file and the controller automatically pushes configuration changes to the nodes upon seeing
any mismatches. Centralized configuration management architecture implemented in which the E2E
controller, serves as the single point of truth for configurations in the network.
Nodes deployment
Figure 1:
Configuration and Alignment
32