Download Print this page

Insignia Noire90 Installation Manual page 34

Advertisement

www.insigniarange.com
Signing off your shower
Now your shower is assembled, there is just few steps before you can sign the shower off.
1.
Please ensure all the connections are watertight including the waste, body jets, internal and external hoses
2. Once you are happy, check the shower functions by switching on the overhead shower and then adjust the
selector knob (top knob) to the hand shower and then onto the body jets. Whilst the water is running, check
external hoses for any signs or water drips or leaks and tighten accordingly.
Please note, when testing the body jets, water will shoot towards the open doors and the user.
3. Do not aim the hand shower directly at the joints of your shower as this does not fall under "normal showering
conditions". However, due to Insignia's unique design of the shower tray, water will only leak back in to the tray so
4. Visually check the water flow in to the waste and adjust the feet of the tray accordingly to ensure the direction
of the water flows towards to the waste to prevent over puddling (a small amount of puddling is normal).
5. Never use the shower until all checks have been made and the installer is 100% happy in the knowledge no hose
6. Any Rubbergum which has squeezed out between the panels and the tray, simply cut off using a sharp, clean knife
7. Now push the shower from it's base into it's final position. NEVER PUSH THE GLASS OR FRAME into its final resting
Happy Showering!
and steam connections.
you won't get flooded.
leaks are present.
blade.
position.
Last Modified: 07/01/2019
34

Advertisement

loading