3.0 Installation

WARNING: Before installing the inverter, read all instructions and caution markings in
this manual and on the inverter as well as on the photovoltaic modules.
WARNING: Electrical installation shall be performed in accordance with all local
electrical codes and the National Electrical Code (NEC), Canadian Electrical Code for
Canada (CEC), NFPA 70.
WARNING: Connecting the inverter to the electric utility grid must only be completed
after receiving prior approval from the utility company and installation performed only
by qualified personnel/licensed electrician(s).
3.1

Checking for Shipping Damage

The inverter is thoroughly checked and tested rigorously before it is shipped. Even though it is
bolted onto a rugged, oversized pallet for delivery, the inverter can be damaged during shipping
by poor handling, trucking or transfer station activity.
Please inspect the inverter thoroughly after it is delivered. If any damage is seen please
immediately notify the shipping company to make a claim. If there is any question about
potential shipping damage, contact Solectria Renewables. Photos of the damage may be helpful
in documenting potential shipping damage.
 Do not accept the unit if it is visibly damaged or if you note visible damage when signing
shipping company receipt.
 Note damage on shipping papers with the truck driver! Report damage immediately to
the shipping company.
 Do not remove the unit from pallet/packaging if damage is evident.
 If it is determined that the unit must be returned, a RMA number must be obtained
from Solectria Renewables prior to shipping the unit back.
DOCR-060371
SGI Series Inverters
10