2.2 Inverter Dimensions 
Refer to the customer interface drawing (DOCR‐070190) for detailed inverter dimensions. 
 
3 Installation 
 
WARNING: Before installing the inverter, read all instructions and caution markings in 
this manual and on the inverter as well as on the photovoltaic modules. 
 
WARNING:  Electrical  installation  shall  be  performed  in  accordance  with  all  local 
electrical  codes,  the  National  Electrical  Code  (NEC),  NFPA  70,  or  Canadian  Electrical 
Code for Canada (CEC). 
 
WARNING: Connecting the inverter to the electric utility grid must only be completed 
after  receiving  prior  approval  from  the  utility  company  and  installation  performed 
only by qualified personnel/licensed electrician(s). 
 
3.1  Checking For Shipping Damage 
The  inverter  is  thoroughly  checked and  tested  rigorously  before  it  is  shipped.  Even  though  it  is 
bolted onto a rugged, oversized pallet for delivery, the inverter may have been damaged during 
shipping by poor handling, trucking or transfer station activity.  
 
Please  inspect  the  inverter  thoroughly  after  it  is  delivered.  If  any  damage  is  seen,  immediately 
notify  the  shipping  company  to  make  a  claim.  If  there  is  any  question  about  potential  shipping 
damage,  contact  Solectria  Renewables.  Photos  of  the  damage  will  be  helpful  in  documenting 
potential shipping damage. 
 
 Do not accept the unit if it is visibly damaged or if you note visible damage when signing 
shipping company receipt.  
 Note damage on shipping papers with the truck driver. Report damage immediately to the 
shipping company.  
 Do not remove the unit from pallet/packaging if damage is evident. 
 If it is determined that the unit must be returned, a RMA number must be obtained from 
Solectria Renewables prior to shipping the unit back. 
 
3.2 Inverter Lifting 
 
WARNING:  The  inverter  may  tip  over  if  improperly  moved,  potentially  causing 
damage  to  equipment,  personal  injury  or  death.  Do  not  tilt  the  pallet  or  inverter 
while moving it. 
DOCR‐070233 
 