5. INSTALLATION

5.1.

RECEPTION OF GOODS

Each device is carefully checked before transportation. When receiving the goods, checking the devices for any damage made during transporta-
tion is recommended. If any damage to the unit is observed, immediately contact the representatives of a transport company. Please inform the
representative of the manufacturer, if any deviation of the device is noticed.
5.2.

TRANSPORTATION AND STORAGE

• The units must be transported to the storage place or installation site using forklifts.
• The recommended storage period should not be longer than one year. In case of storing the units for a period longer than one year, checking if
ture has not accumulated must be performed before the installation of the unit.
RIS EKO 3.0
700 HE
700 HW
In order to prevent damage to the casing, only a product placed on a pallet should be lifted.
5.3.

UNPACKING

Accessories may be packed together with the product. Prior to transporting the unit, the accessories should be unpacked
• Before commencing the installation of the unit, please check if all ordered equipment have been delivered. Any variation from the ordered
equipment list must be reported to the product supplier.
8
| EN
H
W
[mm]
[mm]
1120
840
1120
840
Figure 5.2.1.
L
MAX. NUMBER OF
TRANSPORTED
PACKAGES
[mm]
[pcs.]
1370
1
1370
1
RIS 700 H EKO 3.0 v2020.1
-