Sign In
Upload
Download
Table of Contents
Contents
Add to my manuals
Delete from my manuals
Share
URL of this page:
HTML Link:
Bookmark this page
Add
Manual will be automatically added to "My Manuals"
Print this page
×
Bookmark added
×
Added to my manuals
Manuals
Brands
ABB Manuals
Industrial Equipment
UniGear ZS1
Installation, operation and maintenance instructions manual
Procedure For Setting-Up The Doors; Correct Position Of Cable Compartment Doors; Doors Gasket - ABB UniGear ZS1 Installation, Operation And Maintenance Instructions Manual
With a panel width of 500 mm
Hide thumbs
Also See for UniGear ZS1
:
Instruction manual
(67 pages)
,
Instruction manual
(106 pages)
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
40
41
42
43
44
45
46
47
48
49
50
51
52
53
54
55
56
Table Of Contents
57
page
of
57
Go
/
57
Contents
Table of Contents
Bookmarks
Table of Contents
Advertisement
28
U n i G e a r Z S 1 I N S T A L L A T I O N , O P E R A T I O N A N D M A I N T E N A N C E
5.4 Procedure for setting-up the doors
Closing of doors could be problematic in some
cases. To avoid problems with doors closing
the following shall be fulfilled and followed:
If switchgear is installed properly the doors
shall be in the position in which the upper edge
of door will be parallel with the gap between
the circuit breaker compartment and the low
voltage control cabinet.
—
Figure 30 Correct position of cable compartment doors
Doors gasket shall be installed in correct
direction (3 tooth on inner side and 1 tooth of
the gasket on outer side).
—
Figure 31 Doors gasket
Table of
Contents
Previous
Page
Next
Page
1
...
25
26
27
28
29
30
31
32
Show Quick Links
Quick Links:
Technical Data
Panel Design and Equipment
Assembly of the Switchgear at Site
Operation of the Switchgear
Maintenance
Hide quick links:
Permanently
Temporary
Cancel
Advertisement
Table of Contents
Related Manuals for ABB UniGear ZS1
Industrial Equipment ABB UniGear ZS1 Instruction Manual
(106 pages)
Industrial Equipment ABB ZS1 Instruction Manual
Air-insulated medium voltage switchgear, 12 kv/17.5 kv (67 pages)
Industrial Equipment ABB Inline II ZLBM123 Installation Instructions
(2 pages)
Industrial Equipment ABB Zenith ZTS T Series Operation, Maintenance, And Installation Manual
For zts(d) t-series automatic transfer switches 1600-3000 a and ztsct t-series automatic transfer switches 400-3000 a, 208-480 vac (68 pages)
Industrial Equipment ABB ZGP2 Series Operating Instructions Manual
High temperature zirconia oxygen probe (16 pages)
Industrial Equipment ABB Zenith ZBTS T Series Installation And Operating Instruction
Bypass-isolation automatic transfer switches 100 - 1200 a (112 pages)
Industrial Equipment ABB UniGear ZS2 UniSafe 36 Installation And Maintenance Instructions Manual
Mv arc-proof air insulated metal-clad switchboards (25 pages)
Industrial Equipment ABB UniGear ZS2 Installation, Operation And Maintainance Instructions
(62 pages)
Industrial Equipment ABB ZSD 2020 Operating And Installation Instructions
Central lubrication unit (25 pages)
Industrial Equipment ABB ZP190 Series Operating Instructions Manual
(9 pages)
Industrial Equipment ABB UniGear ZVC Installation, Operation And Maintenance Instructions Manual
(56 pages)
Industrial Equipment ABB UniGear 500R Installation, Operation And Maintenance Instructions Manual
(74 pages)
Industrial Equipment ABB CLMD Instruction Manual
Low voltage capacitors (21 pages)
Industrial Equipment ABB RR 1 Series Original Assembly Instructions
Turbocharger (20 pages)
Industrial Equipment ABB ACS1000 User Manual
System drives (166 pages)
Industrial Equipment ABB HT846308 Operation Manual
(124 pages)
Related Content for ABB UniGear ZS1
AC500-S Verification Procedure For Safe Iparameter Setting In Ac500-S Safety I/Os
ABB AC500-S
HVC 200 Unpacking Procedure
ABB HVC 200
ProKiln GAC400 Adapting The Cleaning Procedure Of The Probe
ABB ProKiln GAC400
ACS880-07 Power Cable Selection Procedure And Applicability Check
ABB ACS880-07
AC500-eCo V3 Licensing Procedure
ABB AC500-eCo V3
Eagle Figure 8: System Time Setting Page
ABB Eagle
OVR-15 Vacuum Test Procedure
ABB OVR-15
ACQ580-01 Connection Procedure
ABB ACQ580-01
ACQ580-01 Connection Procedure
ABB ACQ580-01
Ekip Touch Protection Setting Setup
ABB Ekip Touch
9408 750 A2 Conversion Procedure
ABB 9408 750
M101 Power-On Procedure
ABB M101
ACS880 Setting Up The Diode Supply Unit For Fieldbus Control
ABB ACS880
Orion1 Base Alignment Procedure
ABB Orion1 Base
ACS880 Validation Procedure
ABB ACS880
ACS5000 Opening The Doors
ABB ACS5000
Table of Contents
Print
Rename the bookmark
Delete bookmark?
Delete from my manuals?
Login
Sign In
OR
Sign in with Facebook
Sign in with Google
Upload manual
Upload from disk
Upload from URL