A S S E M B L Y O F T H E S W I T C H G E A R O N S I T E

5.10.2 Control cables

The control cables are conveyed into the panel
through the control wiring duct on the left-hand
side of the panel. Mounting procedure:
Insert the cables into the control wiring duct
on the left-hand side. The duct is covered by
covers
Fasten the control cables at the top end of the
duct, stripthe insulation and convey the cable
control cores into the low-voltage compartment
after the terminal strip frame has been swung up
Connect the control cables to the terminal strip
according to the circuit diagram
Control wiring connections to adjacent panels
are made using a bushing

5.11 Earthing the switchgear

Connect the main earthing bar to the connections
provided in every panel
The floor frame or the erected raised false floor
needs to be protected using the correct wiring
connection
Connect the earthing conductor - coming from
the earth electrode preferably via a removable
bolted connection for testing purpose - to the
main earthing bar of the switchgear
Figure 60 An open terminal frame

5.12 Laying the ring circuits

The ring circuits are supplied - as a rolled-up
bundle - in the control cabinet or in the accessories.
They are marked and fitted with ferrules or
connectors at both ends.
Openings are provided in the side walls of the
control cabinet so that these lines can be looped
through from panel to panel.

5.13 Final erection work

Check painted areas of the switchgear for
possible damage and touch up where required
Check bolt connections, in particular all those
made during the on-site erection of the busbars
and earthing system. Tighten if required
Thoroughly clean the switchgear
Remove all foreign bodies from the panels
Correctly replace all coverings, etc. removed
during erection and connection
In the enclosure, any remaining openings must
be closed if they are no longer needed
Check the isolating contacts and interlocking
mechanisms for smooth motion, and grease
again with isoflex topas NB 52 where necessary
The withdrawable circuit-breaker parts must
be inserted and the control wirings connected
The panels doors must be properly closed
41