Base Iron Fixing System; Structural Data For Foundation Frame On Concrete Floor - ABB UniGear ZS1 Installation, Operation And Maintenance Instructions Manual

With a panel width of 500 mm
Hide thumbs Also See for UniGear ZS1:
Table of Contents

Advertisement

A S S E M B L Y O F T H E S W I T C H G E A R O N S I T E
Figure 27 Base iron fixing system
Figure 28 Structural data for foundation frame on concrete floor
100
300
100
67
67
366
Power cables entry
6-mounting holes
(36x20)
11
56
Control cables entry
500
700
25

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents