Sign In
Upload
Download
Table of Contents
Contents
Add to my manuals
Delete from my manuals
Share
URL of this page:
HTML Link:
Bookmark this page
Add
Manual will be automatically added to "My Manuals"
Print this page
×
Bookmark added
×
Added to my manuals
Manuals
Brands
ABB Manuals
Industrial Equipment
UniGear ZS1
Installation, operation and maintenance instructions manual
Anchoring Bolts On Concrete Floor; Base Irons On Concrete Floor; Through Hole On Metal Structure; Threaded Hole On Metal Structure - ABB UniGear ZS1 Installation, Operation And Maintenance Instructions Manual
With a panel width of 500 mm
Hide thumbs
Also See for UniGear ZS1
:
Instruction manual
(67 pages)
,
Instruction manual
(106 pages)
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
40
41
42
43
44
45
46
47
48
49
50
51
52
53
54
55
56
Table Of Contents
57
page
of
57
Go
/
57
Contents
Table of Contents
Bookmarks
Table of Contents
Advertisement
26
U n i G e a r Z S 1 I N S T A L L A T I O N , O P E R A T I O N A N D M A I N T E N A N C E
—
Figure 29 a) Anchoring bolts on concrete floor
—
Figure 29 c) Through hole on metal structure
d 16
M 12
d 16
—
Figure 29 b) Base irons on concrete floor
M 12
—
Figure 29 d) Threaded hole on metal structure
Table of
Contents
Previous
Page
Next
Page
1
...
23
24
25
26
27
28
29
30
Show Quick Links
Quick Links:
Technical Data
Panel Design and Equipment
Assembly of the Switchgear at Site
Operation of the Switchgear
Maintenance
Hide quick links:
Permanently
Temporary
Cancel
Advertisement
Table of Contents
Related Manuals for ABB UniGear ZS1
Industrial Equipment ABB UniGear ZS1 Instruction Manual
(106 pages)
Industrial Equipment ABB ZS1 Instruction Manual
Air-insulated medium voltage switchgear, 12 kv/17.5 kv (67 pages)
Industrial Equipment ABB Inline II ZLBM123 Installation Instructions
(2 pages)
Industrial Equipment ABB Zenith ZTS T Series Operation, Maintenance, And Installation Manual
For zts(d) t-series automatic transfer switches 1600-3000 a and ztsct t-series automatic transfer switches 400-3000 a, 208-480 vac (68 pages)
Industrial Equipment ABB ZGP2 Series Operating Instructions Manual
High temperature zirconia oxygen probe (16 pages)
Industrial Equipment ABB Zenith ZBTS T Series Installation And Operating Instruction
Bypass-isolation automatic transfer switches 100 - 1200 a (112 pages)
Industrial Equipment ABB UniGear ZS2 UniSafe 36 Installation And Maintenance Instructions Manual
Mv arc-proof air insulated metal-clad switchboards (25 pages)
Industrial Equipment ABB UniGear ZS2 Installation, Operation And Maintainance Instructions
(62 pages)
Industrial Equipment ABB ZSD 2020 Operating And Installation Instructions
Central lubrication unit (25 pages)
Industrial Equipment ABB ZP190 Series Operating Instructions Manual
(9 pages)
Industrial Equipment ABB UniGear ZVC Installation, Operation And Maintenance Instructions Manual
(56 pages)
Industrial Equipment ABB UniGear 500R Installation, Operation And Maintenance Instructions Manual
(74 pages)
Industrial Equipment ABB AC 800M Manual
Controller hardware (200 pages)
Industrial Equipment ABB A130 Operation Manual
Turbocharging (152 pages)
Industrial Equipment ABB REM 543 Technical Reference Manual
(68 pages)
Industrial Equipment ABB CLMD Instruction Manual
Low voltage capacitors (21 pages)
Related Content for ABB UniGear ZS1
UniGear ZS1 Method Of Installation B - Fixing With Anchoring Bolts To Concrete Floor
ABB UniGear ZS1
HVC 200 Prepare The Foundation For The Power Cabinet (Concrete)
ABB HVC 200
ACS880-07 Attaching The Cabinet To The Floor And Wall Or Roof
ABB ACS880-07
UniGear ZS2 Instructions For Floor-Rolling Version Circuit Breaker
ABB UniGear ZS2
ACS5000 Fig. 34. Floor Inclination
ABB ACS5000
ACS6080 Floor Preparation
ABB ACS6080
ACS1000 Fig. 37. Mounting Bolts And Washers For Top Rail
ABB ACS1000
2 Series Floor Space Requirements - Terra 60
ABB 2 Series
Galaxy Power System Cabinet Floor Mounting And Grounding
ABB Galaxy Power System
HVC-C 100-150 kW Prepare A Foundation For The Power Cabinet (Concrete)
ABB HVC-C 100-150 kW
HT578105 Fig. 15: Tightening The Foot Bolts (1)
ABB HT578105
HT575925 Fig. 15: Tightening The Foot Bolts (1)
ABB HT575925
HT575199 Fig. 15: Tightening The Foot Bolts (1)
ABB HT575199
HT591149 Fig. 15: Tightening The Foot Bolts (1)
ABB HT591149
HT575445 Fig. 15: Tightening The Foot Bolts (1)
ABB HT575445
HT576161 Fig. 15: Tightening The Foot Bolts (1)
ABB HT576161
Table of Contents
Print
Rename the bookmark
Delete bookmark?
Delete from my manuals?
Login
Sign In
OR
Sign in with Facebook
Sign in with Google
Upload manual
Upload from disk
Upload from URL