EBRO ARMATUREN SBU Original Assembly Instructions With Operating Instructions And Technical Appendix page 31

Io-link
Table of Contents

Advertisement

Operating instructions - SBU IO-Link
Terminal assignment
X1.1 PE
X1.2 GND
X1.3 +24 V DC ±10%
X1.4
X1.5
X1.6
X1.7
X1.8
X1.9
X1.10
X1.11
X1.12
X2.1 GND
X2.2 +24 V DC
X2.3 Digital input 1
X2.4 Digital input 2
X2.5 Analog input 1
X2.6 Analog input 2
Page 31 of 50
Collective error
Valve is OPEN
Valve is CLOSED (Q) / IO-Link (C)
PE
PE
Solenoid valve GND
Solenoid valve GND
Solenoid valve 1 +24 V DC (max. 2,1 W)
Solenoid valve 2 +24 V DC (max. 2,1 W)
Voltage OK (green)
Voltage polarity reversed (red)
Collective error (red)
OPEN position (green)
CLOSED position
(green)
SV1 activated (green)
SV2 activated (green)
1)
M12-Class A Plug
X3.1
+24VDC
X3.2
Output Valve OPEN
X3.3
0V
X3.4
Output Valve CLOSED (Q) /
IO-Link (C)
X3.5
N.C.
Note:
1)
Voltage supply and output signals for the valve
position are identical as for X1. Parallel use of
these interfaces is not necessary and also not
permitted.
LED signalling

Advertisement

Table of Contents
loading

Table of Contents