PE ENGINE INLET/EXHAUST SYSTEM
Removal and installation
7.
Spray clean engine oil into the oil supply of
the turbocharger and fit the oil supply pipe.
8.
Fit the connector pipe from the turbocharger
and the air intake pipe to the air cooler.
9.
Fit the exhaust brake.
10. Fit the air inlet hose between the
turbocharger and the air filter.
11. Fit the heat shields for the turbocharger.
6
4-2
https://www.truck-manuals.net/
4
CF65/75/85 series
©
200324