Kessel IINNO-CLEAN+ Installation Manual page 99

Septic-system for installation in the ground in nominal sizes ew 4 to ew 50
Table of Contents

Advertisement

Available languages

Available languages

4. Sedimentation phase
The treatment phase is followed by a 2-
hour sedimentation phase. Any solids con-
tained in the sewage as well as the activa-
ted sludge settle on the bottom of the tank
and a clear water layer thus forms in the
upper area, while a sludge layer made up of
microorganisms forms on the bottom.
5. Extracting the clear water
(clear water extraction)
Clear water now remains above this sludge
layer and is fed via the air syphon for the
clear water extraction into the preclarifier or
infiltration plant.
6. Repumping the activated sludge
(sludge extraction)
Excess activated sludge is pumped back
into the preliminary sedimentation.
2. General
99

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the IINNO-CLEAN+ and is the answer not in the manual?

Questions and answers

This manual is also suitable for:

Inno-clean

Table of Contents