5. MEASURING PROCEDURES

5-1 1Φ2W ( one phase by two wires ) measurement
A : Diagram
SCREEN 1 ( 5-1 )
B : Operation Instructions:
B-1 : Power on the instrument by pressing POWER
KEY, and then press 1Φ3Φ KEY to select the 1Φ2W
system, At the time, display will show 1Φ2W connect
diagram approx 4 sec. and the selected name of system
will be appeared on bottom left display of screen 2.
B-2 : Connect the line voltage L1, Vn ( Neutral ) to
V1 and N terminals of the instrument.
B-3:Place the conductor of CP-1201(A1)to A1 as screen 1.
B-4: Connect the output of clamp meter " CP-1200(A1) "
to A1 terminal of the instrument.
B-5: The related measuring factors will be appeared on
display, about the instruction of factor please refer
appendix 1 ( 5-16, page 68 ).
Remark:
During connection ,If want to check connect
Correct or not,please press and hold the "▼" key, display
will show 1Φ2W connect diagram,when release the "▼" key
, will back to measurement.