Lutron Electronics DW-6195 Operation Manual page 52

3 phase power analyzer
Table of Contents

Advertisement

B : Operation Instructions:
B-1 : Power on the instrument by pressing POWER KEY,
and then press 1Φ3Φ KEY to select the 1Φ3W system,At the
time, display will show 1Φ3W connect diagram approx 4 sec.,
and the selected name of system will be appeared on bottom
left display of screen 2.
B-2 : Connect the line voltage L1, L2 and Vn (Neutral) to
V1, V2 and N terminals of the instrument.
B-3 : Place the conductor of CP-1201(A1), CP-1201(A2)
hook to A1 and A2 as screen 1.
B-4 : Connect the outputs of clamp meter
CP-1201(A1)、CP-1201(A2) to A1 and A2 terminals of
the instrument.
B-5 : The related measuring factors will be appeared on
display, about the instruction of factor please refer
appendix 1 ( 5-16, page 68 ).
Remark:
During connection ,If want to check connect Correct or not,
please press and hold the "▼" key, display will show 1Φ3W
connect diagram,when release the "▼" key , will back to
measurement.
screen 2 ( 5-2 )
V1 :
0.0
V2 :
0.0
A1 :
0.00
A2 :
0.00
Q1 :
-
0.000KVAR
Q2 :
-
0.000KVAR
PΣ:
0.000 KW
-
0.00
PF1:
0.00
PFH:
0.000 KWH
WH:
0.000 KVARH
QH:
CP1201
20A
1Φ3W
V
V
A
A
SΣ:
0.000 KVA
-
0.00
PF2:
-
0.0°
Φ1:
SH:
FREQ:
SEC: 2
48
P 1 : -
0.000KW
P 2 : -
0.000KW
S 1 :
0.000KVA
S 2 :
0.000KVA
QΣ:
0.000 KVAR
0.00
PFΣ:
-
0.0°
Φ2:
0.000 KVAH
50.0 Hz
CT: 1
PT: 1

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents