%Q Configuration Values
3-34
This table shows the settings for Grid 1. The same settings apply to the Grid 2 control bits.
These bits must be set during the first PLC scan when the PLC transitions to run mode.
%Q offset 2, 3 & 4 and 18, 19 & 20 set the PSM for the field voltage and power
configuration. Setting these values incorrectly will yield invalid readings. All remaining bits
may be changed during run mode to adapt to changing field conditions.
%Q Bit
Offset
Function
1
GRID 1 Operation
2
GRID 1 Voltage Selection
3
GRID 1 Grid Operational Mode
4
GRID 1 Connection mode
5
GRID 1 PTA_CA measurement
6
GRID 1 CTA measurement
7
GRID 1 PTB measurement
8
GRID 1 CTB measurement
9
GRID 1 PTC measurement
10
GRID 1 CTC measurement
11
GRID 1 CTN measurement
12
GRID 1 Waveform Capture
13
GRID 1 Delta Mode
14
Reserved
15
GRID 1 Energy reset
16
Relay open
17 – 31
Grid 2 control bits
32
Relay close
PACSystems* RX3i Power Sync and Measurement System – February 2013
Value
Comment
1
Enable grid 1
0
120VAC range
1
3-phase
0
4-wire, WYE power system
1
VA1 measurement is on
1
IA1 measurement is on
1
VB1 measurement is on
1
IB1 measurement is on
1
VC1 measurement is on
1
IC1 measurement is on
1
IN1 measurement is on
0
Set this to capture a waveform
0
Delta Mode only affects Delta
configurations
0
Always zero
0
Set this to reset Energy value to Zero
1
Clear this bit (AND set bit 32) to
request synchronizing the Grids
X
Set for desired operation of Grid 2
0
Set this bit (AND clear bit 16) to
request synchronizing the Grids
GFK-2749