Control Box Mounting - Bradley Verge Crestt Series Installation And Maintenance Manual

Multi-feed soap tank
Hide thumbs Also See for Verge Crestt Series:
Table of Contents

Advertisement

Verge
Multi-Feed Soap Tank
®
2

Control Box Mounting

A
Locate the mounting position for the
control box assembly.
Top mounting holes need to be
mounted between 4¹⁄₂" & 9¹⁄₂" from
the top of the deck, and 2¹⁄₂" right or
left of center of shank.
Use a level to ensure the control box
B
assembly is level, and then mark four
mounting hole locations on the wall using
a pencil.
C
Drill the four 1/4" diameter mounting
holes into the wall or surface, using a drill
and appropriate drill bit.
D
Use the supplied mounting screws (or
suitable mounting hardware) to attach the
control box assembly in place.
Appropriate fastener anchors and
mounting hardware must be used
when mounting the control box
assembly in the desired surface.
6
2¹⁄₂" Offset (max) Right or
Left From Center
Mounting
Screws
2/12/2020
10½"
(267)
Fastener
Anchors
Bradley • P20-225 Rev. A: ECO 19-15-015A
Installation
4¹⁄₂" (114)
9¹⁄₂" (241)
Shank
3¹⁄₈" (79)
Mounting Holes
x2
1/4" Dia.
Mounting
Holes

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents