Maintenance and Service
Removal of Equipment Panels
Maintenance and cleaning must be
performed by trained and authorized
personnel only. Said personnel shall
bear all responsibility for their
proper implementation.
1
4
26
Equipment must be separated from
the electric power lines prior to any
maintenance work. Gas supply and
flow and return must be shut off.
5
2
6
7
Maintenance shall be performed once
a year. The cleaning of the heat
exchanger can be voided in case of
minor dirt accumulation but must be
performed at least every 2 years.
3
Disassembly of Boiler Panels
A sealing profile is located between
the front hood (2) and the boiler pa-
nel. For assembly and disassembly of
the front hood, remove the Allen bolt
(1) while exerting some pressure
against the front hood.
Fold front panel forward and pull up-
ward out of the retainer clips (3).
Pull off top panel upward.
Remove side panels (4+5) to the bot-
tom right and left from the retainer
clips (6) and take off at the top via the
two fastening tongues (7).
en