Mechanical model, compact, wall mounted, pressurisation manager, (mechanical single pump) unit (13 pages)
Summary of Contents for elco TRIGON XL 150
Page 1
ma ua for authorized technicians only TRIGON XL 07/2018 420010782402...
Page 3
e e a e u a ......6 ....3 6 i a o ........6 Controls ......... 3 6 o m a e u a o ....6 Display / Programming ....3 7 fo ma o fo i a e a mai e- Overview of main functions ..
Page 4
e e a e u a e u a o ume a o o ai im o - ve a Household i fo ma o , i a ba e fo and similar appliances - Safety afe a e iab e i a a o , om- equi e- mi io i...
Page 5
e e a e u a a e a e a e e v e The use of the appliance for purposes other than those Inform the user on the mode of op- e i e i fo bi e a o of e ve The manufacturer cannot be held e i a...
Page 6
e e a e u a a a a e 26-05-2015 0000000KE000000000000 Q(Hi) 60/80C 30/50C 100% min. mbar mbar mbar Brand Fa o Country of origin Maximum water pressure Boiler type Boiler model - Serial number Commercial reference omi a ea umbe o e ou u - Gas category...
Page 7
e b e The TRIGON XL boiler consists of the fo o i om o e...
Page 8
Technical data Nominal heat output at 80/60°C max/min Nominal heat output at 40/30°C max/min Nominal heat input Hi max/min ua e Max. o e a e o a o um max mi ( , a o um max mi ( , a o um max mi ( , Gas pressure G20...
Page 9
Technical data Nominal heat output at 80/60°C max/min Nominal heat output at 40/30°C max/min Nominal heat input Hi max/min ua e Max. o e a e o a o um max mi ( , a o um max mi ( , a o um max mi ( , Gas pressure G20...
Page 10
Technical data Nominal heat output at 80/60°C max/min Nominal heat output at 40/30°C max/min Nominal heat input Hi max/min ua e Max. o e a e o a o um max mi ( , a o um max mi ( , a o um max mi ( , Gas pressure G20...
Page 11
Technical data o u i fo ma o abou e i e ve e u a o (E ) TRIGON XL 115* Condensing boiler Low-temperature boiler B1 boiler o e e a o a e ea e ombi a o ea e Rated heat boiler rated...
Page 13
e ve A boiler delivery package contains the fo o i om o e a a e Boiler fully assembled and tested Mounted on pallet and sealed in PE foil o fo o e a e o Inside boiler packaging e a o a a a o ma ua Ma a a e...
Page 14
The Trigon XL boiler will be supplied as a complete unit being fully as- sembled and pre-tested. The maxi- mum width is 466 mm for models 150-250 and 746 mm for models ma e i o ib e to transport all models through a normal door in one piece.
Page 15
a emb e a emb e Disassemble the casing before trans- e boi e . i a emb i the casing is done according the fol- lowing steps. e a emb be a e bu eve e Ma e e ea ab e a e a emb e a e e u e a a e...
Page 17
a a o , i i o , mai e a e a boi e e ai , mu be e fo me b qua i e e o , a o i e a o a i a a o ovi io equi eme e o a au o i e a...
Page 18
e b e e o ( ) i em e a- This chapter will explain how to ture return. ma e a e boi e e (o o a ) a e o afe va ve, ma ome e a eae - au i ou be mou e o...
Page 19
F ue a Flue gas system components should be equ eme e u a removable for maintenance purposes. e u a o u o of ue em a e ve i e e fo ea The installer is responsible to apply the country.
Page 20
F ue a e ue The air intake can be connected in e ue a em o e ue a em mu o be i a e of oom ea e a a o . ue a e o ( ) of e boi e , The cover (3) must be disassembled u e ue a...
Page 21
a u a ba e: e ue a em a o be e i- m; x gned and calculated to guarantee that the correct materials are used and that the boiler can work cor- Max mum e m b e e ue a rectly.
Page 22
Electrical connection e e e e o mu made by an authorized installer in accordance with the applicable na- o a a e u- a o . For the power supply it’s necessary to use a mains isolator switch with a contact opening of at least 3 mm within the boiler room.
Page 25
Commissioning a e a Commissioning of the boiler should Tab. 1 be carried out by authorized per- System water sonnel only. Failure to respect this Working temperature 10 - 90°C 10 - 25°C ma e ua a ee >1.5 bar @ 90°C Mi imum o e a e u e >(0.5*) 1.5 @ 80°C...
Page 26
Commissioning eu a a eu a a e e a e eu a i a o em a be e a e, ea e b e boi e a e i e bo om e o of should be drained into the public boiler.
Page 27
Commissioning F ue a e a e F ue a e ue a ai i - take systems are made according to e boi e fo e . f a ea - e a o a a o a e u a o . a e i fou , e ea e ea a e be-...
Page 28
Commissioning e a e b e Return (ESC) Room temperature control ma o ( Manual mode Chimney sweeper mode Info mode e e bu o e a o mo e ea o e( ) Display e a o mo e e a a e u e To guarantee safety and the correct...
Page 29
Commissioning a m mum a Start the boiler in controller stop Switch the boiler to minimum load mode and go to 50% load. Now the (0%). boiler operates at 50% load. Allow e ombu o the boiler to stabilise the combus- same way as described for full load.
Page 30
Commissioning Check gas Valve a va ve e boi e Due to the length of the chimney a be o i e e a o a e o a e a o - methods shown below. ave a e a ve im a e i i o a abi i...
Page 31
Commissioning ev e ev e All safety devices have to be checked oo fu o i . Safety devices on a standard boiler a e a em e a u e e - em e a u e e - o , ue a em e a u e e o a io i a o e e o e.
Page 32
Commissioning of a ea e o e e a a a e , fo exam- ( ); e o ; a e of mixi em, e . When the boiler will not be used for e io , e boi e b fo o i o e u e: e boi e i...
Page 34
Return (ESC) Room temperature control ma o ( Manual mode Chimney sweeper mode Info mode e e bu o e a o mo e ea o e( ) Display e a o mo e ) ( ) eae a e ( ) o e a o ) (B) By pressing the manual mode but-...
Page 35
DHW mode selection DHW mode selection Heating operation mode selection Heating operation mode selection (Controller Stopp mode when (Controller Stopp mode when pressing > 3 sec.) pressing > 3 sec.) Display Display Info button Info button Quit menu Confirm Confirm Quit menu Manual mode Manual mode...
Page 38
Maintenance e e e Maintenance of the boiler should be e a e e i i o a io i a- carried out by authorized personnel o e e o e ; only. Clean the condens tray; ea a o e u e o e ombu o afe o e a o of e boi e , i...
Page 39
Maintenance Remove the cover on the con- dens tray (1); Clean the tray; Close the condens tray; emove o ( ) f om e a e o e o ( ); ea a a e ; o i i a o i o .
Page 40
Maintenance ambe Remove the syphon from the con- e a e o e o ; Remove the cap (5) from the dirt o e o o e bo om of phon (4); Clean it with plenty fresh water; Close the cap of the dirt collector Reconnect the syphon to the condense connector.
Page 41
Maintenance em a a e qua ev e em a e ombu o a fu of o e a o , mi imum oa , o e e e - check the main physicals and chemi- e e a . A i o a cals parameters of water.
Page 43
Lockouts a e of a o ou , a a i DESCRIPTION OF ER- ERR. CAUSE bol ( a a i CODE appears on the display. The cause of u i e e o fau (B ) ( oom mo e , a fau be e e mi e Outside sensor fault...
Page 44
Lockouts ERR. DESCRIPTION OF ERROR CAUSE CODE e o , i u i e u e Gas pressure switch safety shut- down Gas pressure switch is open o e o ou e ex ee e me fo e ab i me me fo e ab i me of a- ame ex ee e...
Page 45
Sensor values em e a u e e The diagrams show the sensor val- , e u , ue a , ea e e ues for all boiler sensors and op- o a e o avai ab e i a e o kits.
Page 46
e a a e a a E o BV, am aa a e ( Declares that the product TRIGON XL is in conformity with the following standards EN 15502-1 EN 15502-2-1 EN 55014-1 / -2 EN 61000-3-2 /-3 EN 60335-1/ -2 i a o a e i e ui e i e of i e ve : 1992 / 42 /...
Page 48
DE - 72379 Hechingen a mb AT - 2544 Leobersdorf CH - 7324 Vilters ELCO BV NL - 6465 AG Kerkrade Be um BE - 1070 Brussel IT - 31023 Resana Ba i o , E ex,...
Need help?
Do you have a question about the TRIGON XL 150 and is the answer not in the manual?
Questions and answers