KP100G
Completion Inspection
No.
Inspection Item
1
Connect the PV-
2
panels
Power-ON delay time
for grid-connected
3
operation
(See Note 1.)
Confirm the
4
wattmeter
Note 1 : The power -ON delay time is the time that it takes for the KP100G to resume operation after the power supply of the supply side has been
restored following an error, such as a power interruption. The remaining seconds are counted down on the display during the power-ON delay
time.
Table 5-5 Recovery time of the KP100G
Model
KP100G-OD-ES
KP100G-OD-IT
KP100G-OD-DE
Table 5-4 Completion Inspection
Procedure
High voltages exist when the PV-Panel is exposed to the sun. Exposed
terminals of the PV-Panel are live, and can cause electric shock. Avoid
making physical contact with live parts of the device.
After the PV-Panels are connected to the PV-Inverter, the output voltage is
greater than 200VDC and the AC grid is not connected to the inverter, the
Data Logger LCD displays.
P a c : 0 W
V a c : 0 . 0 / 0 . 0 / 0 . 0 V
I a c : 0 . 0 0 / 0 . 0 0 / 0 . 0 0 A
F r e q u e n c y : 0 0 . 0 0 H z
S t a t u s : F a u l t
E 1 - 0 : N o U t i l i t y
12/05/06 16:13
Step 1:
Check the connection between your PV-Inverter and AC Connection System.
And then check the connection between the Public Utility and AC Connection
unit.
Close the AC breaker or fuse in the unit.
Step 2
Measure the time until operation resumes. (The power-ON delay time varies
depending on the country. Refer to Table 5-5)
Step 3
Confirm that the Data Logger LCD displays the status "Normal" and that the
KP100G performs the grid-connected operation.
P a c : 2 9 1 W
V a c : 2 2 2 . 2 / 2 2 2 . 8 / 2 2 3 . 3 V
I a c : 0 . 4 3 / 0 . 4 2 / 0 . 4 1 A
F r e q u e n c y : 5 0 . 0 0 H z
S t a t u s : N o r m a l
12/05/06 16:31
The PV-Inverter is feeding power to the grid, and the green LED displays.
The Wattmeter installed to count the injected electricity should work while
the inverter displays that electricity is being injected.
Country
Recovery Time (sec)
Spain
Italy
Germany
30
180
20
30
Reference
Check
Page
mark
---
35
28
30
34