Simrad EK80 Harbour Acceptance Test page 67

Wide band scientific echo sounder
Hide thumbs Also See for EK80:
Table of Contents

Advertisement

• All relevant external sensors are connected to the EK80. The sensors are turned
on and operate normally.
• The vessel is berthed.
• The relevant peripheral system is connected to the EK80 Processor Unit.
• The connection has been made using a serial or Ethernet communication port.
• All the relevant communication parameters have been defined.
• The peripheral system is turned on, and it transmits data.
Neither tools nor instruments are required.
Procedure
1
Open the
Setup
2
On the
menu, select
Setup
Observe that the
of pages selected from the menu on the left side.
3
On the left side of the
4
Make sure that each input port is functional.
a
Select the relevant communication port.
b
Select
Monitor
c
Make sure that there is data traffic on the input port (shown in the
In order to see this data traffic, the peripheral system must be turned on, and
transmitting information to the EK80.
d
If you are unable to see any data traffic on the communication port, we suggest
the following:
1
Make sure that the peripheral system has been turned on.
2
Make sure that the peripheral system is in fact transmitting information.
3
Make sure that the cable has been properly connected.
4
Make sure that you have connected the peripheral system to the
communication port that you are observing.
e
Select
OK
5
Make sure that each output port is functional.
a
Select the relevant communication port.
b
Select
Monitor
c
Make sure that there is data traffic on the output port (shown in the
box).
401925/C
menu.
Installation
dialog box opens. This dialog box contains a number
Installation
dialog box, select
Installation
to open the
Port Monitor
to close the
Port Monitor
to open the
Port Monitor
.
I/O Setup
dialog box.
dialog box.
dialog box.
Secondary procedures
.
box).
Rx Data
Tx Data
67

Advertisement

Table of Contents
loading

Table of Contents