Verifying The Communication With The Motion Reference Unit (Mru) - Simrad EK80 Harbour Acceptance Test

Wide band scientific echo sounder
Hide thumbs Also See for EK80:
Table of Contents

Advertisement

If necessary, enable the read-out in the
8
If possible, use another instrument to verify that the information provided by the
EK80 is correct.
9
Fill in the result tables.
Result
Datagram
Requirements
Speed data is provided and displayed.
The relevant communication parameters are recorded.
Date and signature:
Related topics
Customer acceptance form, page 46
Secondary procedures, page 47
Verifying the communication with the motion
reference unit (MRU)
The information from a motion reference unit (MRU) (normally heave, roll and pitch
information) is imported into the EK80 to increase the accuracy of the echo data. The
communication with the sensor is tested. This task is only applicable is you are using an
external motion reference unit on your EK80.
Prerequisites
The EK80 is installed as specified in the EK80 Installation manual.
• The sensor is connected to a communication port on the EK80. The sensor is turned
on and in normal operation.
• The interface port is set up with the correct communication parameters.
• You are familiar with NMEA and other relevant datagram formats.
• You know how to set up the parameters for serial and local area network (LAN)
communication.
• All relevant vessel drawings, installation reports and/or measurement results are
available.
• The EK80 system is turned on and operates normally.
401925/C
Port
Testing the EK80 operational functionality
dialog box.
Display Options
Baud rate
Talker ID
Results
41