Chapter 2: Installation
Page 2-2
Before equipment installation, a qualified technician should
use an outlet tester or voltmeter to check the AC receptacle
for the presence of ground as shown in Figure 2-1.
120 volts
Neutral
Ground
Less than
1 volt
FIGURE 2-1
AC Power Receptacle
The voltage measured from Phase to Neutral should be
1.
110 to 125 VAC.
The voltage measured from Phase to Ground should be
2.
110 to 125 VAC.
The voltage measured from Neutral to Ground should be
3.
less than 1 VAC.
If the receptacle is not a properly grounded 3-prong type, stop the
installation. Installation can only be completed after a qualified
electrician corrects the problem.
DEFINITY
Phase
120
volts
Communications System
DEFINITY High Speed Link
User´s Guide