Aerobell 268 Preventive Maintenance Schedule - Ransburg AEROBELL 268 A13657 Service Manual

Table of Contents

Advertisement

AEROBELL 268 PREVENTIVE MAINTENANCE SCHEDULE

Procedure
Mid Shift Cleaning
• Wipe shroud
• Visually inspect cup
End of Shift Cleaning
• Wipe shroud
• Wipe bell cup down
• Change cloth cover
Shaping Air Shroud and Cap
• Clean shroud
• Clean shape air cap
Bell Cup Removal/Inspection/
Cleaning/Tightening
Fluid tip inspection/cleaning
Inspect Valve and Seat
Assembly for leaking
Replace Valves and or Seats
in valve module
Verify Resistance of High
Voltage Resistor
High Voltage Cable
Inspections
High Voltage Testing
Inspect all screws
• Replace if broken
• Inspect for wear
• Tighten per specifications
Inspect Turbine Spindle
Taper and Threads
Replace Bell Cups
Replace Splash Plates
Inspect and Clean
• Spindle
• Bore
• Fluid Tube OD
Inspect for Fluid Leaks
High Voltage Cable
Replacement
LN-9282-14
Mid-Shift
End of Shift
Weekly
Daily
Aerobell 268 - Maintenance
Frequency (Maximum)
2 Weeks
Monthly
3 Months
6 Months
Yearly
• •
44

Advertisement

Table of Contents
loading

Related Products for Ransburg AEROBELL 268 A13657

Table of Contents